How should a construction subcontractor in Hampton Roads handle 1099s, retainage and BPOL?
Construction subcontractors in Hampton Roads should match each general contractor’s 1099-NEC to their own deposits, track retainage as money owed until it is paid, deduct insurance and bond costs, and file BPOL under the contractor classification. A & A Bilingual Tax Services in Chesapeake keeps job-by-job books for subs and prepares their returns in English or Spanish.
Key facts
| Norfolk contractor license rate | $50 per classification at $100,000 or less in gross receipts; above that, contractors pay $0.16 per $100. Source: norfolk.gov |
|---|---|
| Virginia Beach contractor license rate | Flat $25, $40 or $50 up to $200,000 in gross receipts; above that, contractors pay $0.16 per $100. Source: s3.us-east-1.amazonaws.com |
| Newport News contractor license rate | Flat $30 or $50 up to $100,000 in gross receipts; above that, contractors pay $0.15 per $100. Source: nnva.gov |
| York County contractor rule | Contractors pay $0.16 per $100 above $100,000. A York County job under $25,000 needs no county license. Source: yorkcounty.gov |
| Williamsburg out-of-area contractors | Contractors pay $0.16 per $100 ($30 minimum). Out-of-area contractors expecting under $25,000 in city receipts are exempt. Source: williamsburgva.gov |
| When GCs must send your 2026 1099-NEC | 2026 Forms W-2 (to employees and SSA) and 1099-NEC (to IRS and recipients) are due Monday, February 1, 2027, because January 31, 2027 is a Sunday. Source: irs.gov |
Last reviewed:
Working under someone else’s contract
This page is for the framer, drywall hanger, roofer, concrete finisher, painter, flooring installer or low-voltage crew that works under a general contractor’s contract: new subdivisions in Chesapeake and Suffolk, commercial build-outs in Norfolk, or work tied to the shipyards in Newport News and Portsmouth. You bid to the GC, invoice the GC, and wait on the GC’s pay schedule.
If you mostly sell directly to homeowners, run your own permits and act as the prime contractor, our contractors and trades page is written for you. The two overlap, but subs face retainage, insurance requirements and 1099 matching that a prime contractor handles from the other side.
Matching 1099-NEC forms from each GC
Every general contractor that paid you for 2026 work should send a 1099-NEC by February 1, 2027. The IRS gets a copy, so the total of your 1099s is the minimum income it expects on your return. Problems show up when a GC reports a check you deposited in January, counts a joint check made out to you and your supplier as all yours, or simply types the wrong figure.
We list every GC, the amount on its form and what your own records show, and we write down the reason for each difference before filing. If a form is plainly wrong, ask the GC for a corrected one. Keep your W-9 on file with each GC so your name and taxpayer number match.
Retainage: earned, but not in the bank
Most GC contracts hold back part of each payment until the job or your phase is finished and accepted. That retainage is real money owed to you, and on a busy year it can add up across a dozen jobs. Whether it counts as income before you receive it depends on your accounting method; for many small subs reporting on a cash basis, it becomes income when it is paid.
- Track retainage owed by job and by GC, separate from regular invoices
- Note the condition for release: final inspection, punch list or owner acceptance
- Follow up at closeout; old retainage is the easiest money to forget
Insurance, bonds and back-charges
GCs usually require a certificate of insurance before you set foot on site: general liability, commercial auto, workers’ compensation and sometimes an umbrella policy. Larger jobs may require performance or payment bonds. Premiums, bond costs and the fees to add a GC as additional insured are deductible business expenses.
Watch for costs the GC takes out of your payments: cleanup back-charges, insurance program charges, dumpster fees or damage claims. Record the gross amount you billed and the back-charge as an expense, so your income ties to the 1099 and the cost is not lost. If you hire lower-tier subs, collect their insurance certificates too, or your own workers’ compensation audit may charge you premium on what you paid them.
BPOL under the contractor classification
Local business license tax treats contractors as their own classification, usually at a lower rate than services. Contractors pay $0.16 per $100 of gross receipts in Norfolk, Virginia Beach, York County and Williamsburg once past the local flat-fee tier, and $0.15 in Newport News. Chesapeake’s $50 fee for qualifying new businesses specifically excludes contractors.
Working across city lines has its own rules. York County requires no county license for a job under $25,000, and Williamsburg exempts out-of-area contractors expecting under $25,000 in city receipts. Above those amounts, a separate license may be due where the work is. That is why we track receipts by job location. See York County and Newport News for local detail.
Your crew and the subs below you
Workers you direct every day, on your schedule, are generally employees, and our payroll service handles their withholding and W-2s. Independent lower-tier subs get a W-9 from you before the first check and a 1099-NEC from you at year-end, due the same February 1, 2027 date as the forms you receive.
How we help subcontractors
We set up bookkeeping by job, with revenue, materials, labor, equipment rental, dump fees, retainage and back-charges each in their own place; reconcile your GC 1099s; and prepare your business tax return. Appointments are at our Chesapeake office, in English or Spanish. Call (757) 319-1773.
Common questions
A GC’s 1099 is higher than what I was paid. What do I do?
Ask the GC for a corrected form and keep a copy of your request. If none comes, we report the amount on the form and show the adjustment with your records, so the return reconciles to what the IRS received.
When do I report retainage as income?
On a cash basis, usually when you receive it. On an accrual basis, it can be earlier. We look at your method and your contracts before year-end so nothing is counted twice or missed.
Are bond premiums and insurance deductible?
Yes, when they are business costs. Prepaid policies that run into next year may need to be split between years, so keep the policy dates with the invoice.
Do I need a business license in every city where I work?
Generally you license where your business is based, but large jobs in another locality can require a license there. York County and Williamsburg both set a $25,000 line for outside contractors.
I sub for GCs and also do small jobs for homeowners. Does that change anything?
Your return combines both, but your books should split them, because homeowner jobs do not come with 1099s or retainage. Our contractors and trades page covers the direct-to-customer side.
Can you work with my crew in Spanish?
Yes. We explain W-4s, pay stubs and W-9s in Spanish and meet with you in whichever language you prefer.
Request a call back
Tell us a little about what you need. We reply in English or Spanish.
(757) 319-1773 555 Belaire Ave, Ste 210 #2038Chesapeake, VA 23320